It was underground Firefighting Water line detection in IRAQ Oil plant.
Please contact Q&A or Email as below for more information and question.

great_won@naver.com

2019 06 22

has done by : Jongjun Lee, Head of the team

                           Byungsoo Noh, Asst manager

                           Kwangwon Shin, Asst manager

 

 

현장배경2.jpg

 

현장조사0.jpg

 

현장조사2.jpg

 

현장조사.jpg

 

가스탐사2.jpg

 

가스탐사4.jpg

 

가스탐사2.jpg

 

가스탐사5.jpg

 

가스탐사6.jpg

 

청음3.jpg

 

청음5.jpg

 

청음6.jpg

 

시공사진1.jpg

 

시공사진2.jpg

 

시공중 가스탐사2.jpg

 

시공중 탐사1.jpg

 

시공중가스탐사3.jpg

 

누수포인트.jpg

 

누수포인트1.jpg


단체사진.JPG

 
 
Site Information
Pipe material  : GRE
Total length :  FW (Firefighting Water) : 1.9 km
Diameter : 12inch 
Joint : lamination type

Leak point
FW : 2 points detected.

* It was too small leak.( 0.1bar drop for 42 hours )